Process of inspecting road bridges in Ho Chi Minh City - Part 1: Existing inadequacies in the current process

creativework.keywordsDeformation
creativework.keywordsDamping coefficient
creativework.keywordsNatural frequency
creativework.keywordsSimple bridge construction
creativework.keywordsInspection
dc.contributor.authorNguyen Quang Thanh
dc.contributor.authorVu Ba Tu
dc.contributor.authorNguyen Hoai Bac
dc.contributor.authorNguyen Dang Quang
dc.contributor.authorNguyen Anh Tuan
dc.contributor.authorNguyen Tien Thuy
dc.date.accessioned2024-07-23T08:07:55Z
dc.date.available2024-07-23T08:07:55Z
dc.date.issued2022-05
dc.description.abstractQuality inspection of traffic works, including quality control of simple bridge construction, is always a big problem in the management process of current authorities. This article will evaluate the outstanding issues in this current demand test standard, in which the study will build an overview evaluation model of the demand test standard and identify the outstanding shortcomings. The analysis from the article shows that the inspection process has problems that need to be supplemented and improved to both meet the requirements according to the process and properly represent the scientific nature of the problem. In addition, the inspection standards need to strongly eliminate problems that are not really necessary or that do not affect the quality of the work at the time of the survey. The issues investigated from the testing standards in the following sections include: remaining shortcomings in the existing bridge testing process; necessary additions in the bridge inspection process based on the development of science and technology; the bridge health monitoring system has been bringing about important decisions in assessing the quality of the bridge construction; the existing demand testing process – how to better match the rate of change of the present.
dc.identifier.issn1859-4263
dc.identifier.urihttps://thuvienso.ut.edu.vn/handle/123456789/1976
dc.language.isoen
dc.relation.ispartofseriesVolume 11; Issue 2
dc.titleProcess of inspecting road bridges in Ho Chi Minh City - Part 1: Existing inadequacies in the current process
dc.typeArticle
Tệp tin
Tập tin chính của tài liệu
Đang hiển thị 1 - 1 của tổng số 1 kết quả
Không có ảnh thu nhỏ nào
Tên:
Nguyen Quang Thanh.pdf
Dung lượng:
1.04 MB
Định dạng:
Adobe Portable Document Format
Tập tin giấy phép
Đang hiển thị 1 - 1 của tổng số 1 kết quả
Không có ảnh thu nhỏ nào
Tên:
license.txt
Dung lượng:
612 B
Định dạng:
Item-specific license agreed to upon submission
Mô tả: