Components of volume loss induced by EPB TBM tunnelling in sandy soils – A case study in Ho Chi Minh City Vietnam

creativework.keywordsTunnelling
creativework.keywordsSurface settlement
creativework.keywordsVolume loss
creativework.keywordsCase study
dc.contributor.authorCuong Quoc Vo
dc.contributor.authorHien Van Nguyen
dc.contributor.authorTra Thu Thi Nguyen
dc.contributor.authorThi Ngoc Huynh
dc.contributor.authorBinh Thanh Le
dc.date.accessioned2024-10-07T05:07:19Z
dc.date.available2024-10-07T05:07:19Z
dc.date.issued2021-05
dc.description.abstractThe 781m twin tunnel in line No 1 Ben Thanh – Suoi Tien was the first tunnels constructed by Earth Pressure Balance Tunnel Boring Machine (EPB TBM) in the urban area in Ho Chi Minh City, Vietnam. Field data on a surface settlement at three sections, measured during the construction period from May 2017 to June 2018, are used for back analyses on the development of surface settlement with the corresponding advancement of the EPB TBM. From there, the contributions of the main components of volume loss are determined which can be a useful reference for similar tunneling projects in the local area.
dc.identifier.issn1859-4263
dc.identifier.urihttps://thuvienso.ut.edu.vn/handle/123456789/2177
dc.language.isoen
dc.relation.ispartofseriesVolume 10; Issue 2
dc.titleComponents of volume loss induced by EPB TBM tunnelling in sandy soils – A case study in Ho Chi Minh City Vietnam
dc.typeArticle
Tệp tin
Tập tin chính của tài liệu
Đang hiển thị 1 - 1 của tổng số 1 kết quả
Không có ảnh thu nhỏ nào
Tên:
Cuong Quoc Vo.pdf
Dung lượng:
801.16 KB
Định dạng:
Adobe Portable Document Format
Tập tin giấy phép
Đang hiển thị 1 - 1 của tổng số 1 kết quả
Không có ảnh thu nhỏ nào
Tên:
license.txt
Dung lượng:
612 B
Định dạng:
Item-specific license agreed to upon submission
Mô tả: